# Interconnection Guide

**Date:** 2025/02/26  
**Source:** lunarenergy.com

---

## Start Application

| Item 1 | Select: 'Option2-ConnectSolarPanels,WindTurbines,orOtherGeneratingEquipment' |
| --- | --- |
| Item 2 | Select:'Option1-SimpleSolar,Windand/orEnergyStorage' |
| Item 3 | Select:'Option2-StandardNEMwithEnergyStorage' |

## Project Information

### Customer and Facility Info

| Program | Confirm selection:'Simple Solar, Wind and/or Energy Storage' |  |
| --- | --- | --- |
| Subprogram | Confirm selection:'Standard NEM with Energy Storage' |  |
| Service Type | Select:'New Generating Facility(Existing Electrical Service)' |  |
| Electrical Service Agreement Number | Enter/paste Service Agreement ID: |  |
|  | ENERGY STATEMENT
Account No:
Statement Date: 07/12/2024
Due Date: 08/02/2024 |  |
|  | Details of Gas Charges
06/07/2024-07/08/2024(32 billing days)
Service For:
Service Agreement ID:
Rate Schedule G1 XB Residential Service
06/07/2024-06/30/2024Your Tier Usage12 |  |
|  | Service Information
Meter#
Current Meter Reading 7,275
Prior Meter Reading 7,259
Difference 16
Multiplier 1.044443
Total Usage 17.000000Therms
Baseline Territory X
Serial M |  |

**Make sure to enter the ELECTRIC service agreement number and meter, not Gas. The system will not recognize the gas numbers.**

---

## Equipment Details System #1

| Program | Confirm selection:‘Standard NBT/NEM Paired Storage’ |
| --- | --- |
| Tech Type | Select dropdown:‘Solar PV’ |
| Generator Type | Select dropdown:‘Inverter-External’ |
| Fuel Type | Select dropdown:‘Solar’ |
| Will this Generator be used as a Backup? | Select:‘Yes’ |
| How will the generator act as a back-up? | ATS |
| Please Select an Anti-I Island Detection Method | Select:‘Group 1: Frequency Shift with continuous positive frequency feedback’ |
| Please provide method of Transition | Open |
| Do you plan to limit export? | Select:‘No’ |
| Manufacturer | Select dropdown:‘Lunar Energy, Inc.’ |
| Model | Select dropdown:‘LE-ESS-20KWH [240V] [SI1-SB]+10-005025[240V]’ |
| Quantity | Enter/paste inverter quantity:‘1’ |

## System #1 - Power Module #1 for PV modules

| Add Power Module | Click button: '+ Add Power Module' |
| --- | --- |
| Tech Type | Select dropdown: 'solar PV' |
| Generator Type | Select dropdown: 'PV Panels' |

---

| Fuel Type | Select dropdown:‘Solar’ |
| --- | --- |
| Manufacturer | Select dropdown, specific to project |
| Model | Select dropdown, specific to project |
| Quantity | Enter/paste module quantity |

## System #1 - Power Module #2 for DC-coupled Lunar Battery

| Add Power Module | Click button: '+ Add Power Module' |
| --- | --- |
| Tech Type | Select dropdown: 'Storage' |
| Generator Type | Select dropdown: 'Battery' |
| Fuel Type | Select dropdown: 'Onsite Renewable' |
| Enter Manufacturer Not In List | Leave unchecked |
| Manufacturer | Select dropdown: 'Lunar Energy, Inc.' |
| Model | Select dropdown: 'LE-ESS-20KWH [SI1-SB][DC]' |
| Software Version | 0 |
| Charging Mode | No Grid Charging |
| Exporting to Grid? | Yes |
| Operating Mode | Parallel Only(No Export) |
| Quantity | 1 |
| Maximum Storage Capacity(kWh) | 20 |
| Estimated Annual Net Energy Usage for Energy Storage Device(kWh) | 0 |

---

| Will the Distribution System be used to charge the storage device? | Select: “No” |
| --- | --- |
| Charging Function Rated Charge Demand(Load kW) | 6.67 |

## Usage and Production

| Estimated Solar Annual Production | Lunar Note
You will get a very high PV estimate. Lunar has flagged this issue to PG&amp;E. PG&amp;E has an advice letter ongoing with California public utilities commission to have the calculations switched, until then the issue will remain as it is and is known by all parties. |
| --- | --- |
| Planned Increase In Annual Usage(kWh) | Annual usage + Increase in annual usage = 100% of solar annual production estimate |

## Documents

| Transfer Switch Scheme Documentation | See Lunar Bridge specification in the Lunar System Datasheet on Documentation Center |
| --- | --- |
| Manufacturer's Documentation for Anti-islanding Method | See Declaration of Conformity on Anti-Islanding on Documentation Center |

## Revision History

| Revision | Description of Change | Effective Date |
| --- | --- | --- |
| 1 | Initial Release | 2/26/2025 |
| 2 | Minor update on dropdown value | 4/11/2025 |