## Wall Bracket Anchoring

2x4 Wooden Studs

| Method        | Stud Requirements                          | Fastener Requirements                                                   |
|---------------|-------------------------------------------|----------------------------------------------------------------------|
| **Surface Mount** | Min. 1 stud (center or off-center)     | 1x fastener (min. 1/4” dia) into stud (min 2” depth)<br>1x fastener into wall with >=30lb anchor |
| **Semi-Flush**    | 2 adjacent studs 14.5” apart(16” on center) | 4x #8 fasteners (2 per side) into studs (min 1” depth)               |

## Surface Mount

1

Dry fit bracket

Dry fit bracket over stud. Mark wall at bottom of Bridge, then measure up 22” to position bracket.

2

Install bracket

Install bracket using min. 2 screws (1 must be in stud).

3

Hang enclosure

Hang enclosure on bracket. The Bridge can slide +/- 1” for alignment.

4

Install anchors

Secure enclosure by installing two anchors through the lower embosses.

## Semi-Flush Mount

Follow [Wall Bracket Anchoring](https://installerguides.lunarenergy.com/installation/bridge/mounting#wall-bracket-anchoring) instructions.

Enclosure must extend at least 3” from wall surface for door clearance.

Door must be capable of opening >= 90°.

[Bridge Location Requirements](https://installerguides.lunarenergy.com/installation/bridge/clearance) [Installing Conduit](https://installerguides.lunarenergy.com/installation/bridge/conduit)