## Documentation Index

Fetch the complete documentation index at: [/llms.txt](https://installerguides.lunarenergy.com/llms.txt)

Use this file to discover all available pages before exploring further.

1. **Apply Metal Tape**  
   The provided 7-inch metal tape must be attached from the conduit fittings to the inverter wall bracket (extending **2-3”** onto the wall bracket) for both the AC and DC conduits.
   
   If conduits are present on both sides, the tape must be applied to both sides.

2. **Attach Magnet Strap**  
   Attach the Inverter magnet strap to the top Battery Block.
