ESS Location Requirements - Lunar System Installation Guide

Clearance Requirements

Requirement Specification
Minimum clearance on sides 6 in (15.2 cm) to all obstructions.
Additional clearance recommended from hot air sources to avoid power limiting.
Minimum clearance above system 2.5 in (15 cm)
Minimum wall space for installation 36.4 in (92 cm) wide. Height depends on quantity of DC ESS units.
Maximum height above ground/floor to bottom of ESS for rotary switch on inverter (RSID) to be 6’7” from grade L2-ESS-10kWh: 50.4 in (128 cm)
L2-ESS-15kWh: 39.7 in (101 cm)
L2-ESS-20kWh: 29.1 in (74 cm)
L2-ESS-20kWh+(1) LE-DC-UNIT: 18.5 in (47 cm)
L2-ESS-20kWh+(2) LE-DC-UNIT: 7.8 in (20 cm)
Maximum height above ground/floor to bottom of ESS where external RSID is field installed less than 6’7” from grade No limit
Minimum clearance in front of battery Abide by local code
Minimum clearance to doors and windows directly entering the dwelling unit (N/A to attached or detached garages) Abide by local code
Minimum room size for indoor installation 283 cu ft. (8.01 m3)

Distance between Components

Connection Max Distance Wire Gauge
Inverter to Maximizer Hub 200 ft (61 m) 12 AWG – 4 AWG
Inverter to Bridge (AC) 95 ft (29.5 m) 8 AWG – 4 AWG
Inverter to Bridge or MSA Controller (Comms) 95 ft (29.5 m) Cat5e, Cat6, Cat6a, or 14–22 AWG (shielded, twisted or untwisted)

Top Alignment

Use the following measurements to align the ESS, Lunar Bridge, and conduits from the top of the inverter cover.

Measurement Value
From Inverter Top Cover to Top of Inverter Bracket 19 mm (3/4”)
From Inverter Top Cover to Lower Conduit Entry Center 269 mm (10 5/8”)
From Inverter Top Cover to Bridge Mount Bolt Hole Center 92 mm (3 5/8”)
Configuration From Inverter Top Cover to Top of Lowest Battery Bracket From Inverter Lower Conduit Entry Center to Top of Lowest Battery Bracket
10 kWh 586 mm (23 1/8”) 316 mm (12 1/2”)
15 kWh 857 mm (33 3/4”) 587 mm (23 1/8”)
20 kWh 1128 mm (44 3/8”) 858 mm (33 3/4”)
25 kWh 1399 mm (55 1/8”) 1129 mm (44 1/2”)
30 kWh 1670 mm (65 3/4”) 1400 mm (55 1/8”)

Network & Connectivity

Reliable internet connection via Wi-Fi ( 2.4 GHz only) or Ethernet is required for firmware updates and warranty compliance. Cellular (LTE CAT M1) is available as a backup connection method.

Failure to maintain a persistent internet connection may reduce the warranty terms. See the Lunar Warranty for details.