Stringing Requirements - Lunar System Installation Guide

Documentation Index

Fetch the complete documentation index at: /llms.txt

Use this file to discover all available pages before exploring further.

PV Module Requirements

Requirement 650W Maximizer 420W Maximizer
Maximum Rated Power Output 650 W 420 W
Maximum Short Circuit Current (Isc) 20 A 20 A
Maximum Open Circuit Voltage (Voc) 75 V 60 V

Series String Requirements

Requirement 650W Maximizer 420W Maximizer
Maximum # of PV Modules per String Typical site: 20 recommended
Shaded PV: 24
20
Minimum # of PV Modules per String 9 9
Minimum # of PV Modules within +/- 5° pitch and azimuth 7 7
Maximum Usable Power per String 6.6 kW 6.6 kW
Maximum DC Current per String 16 A 16 A
Recommended Max STC Nameplate Power per String
for un-shaded PV sites
8.4 kW 8.4 kW

Parallel String Requirements

Requirement 650W Maximizer 420W Maximizer
# of Parallel Strings Allowed 3 3
Uneven String length Allowed Yes Yes
Maximum Total DC Current from PV to Inverter 37.5 A 37.5 A
Maximum Total Usable Power 15 kW 15 kW

Communication Distance

Each Maximizer only needs to be in the communication range of a single Maximizer (or Maximizer Hub) to communicate with the Lunar System.

Environment Wifi Mesh Communication Range (point to point)
Metal Roof 30 ft (9 m)
Any other roof 60 ft (18 m)
Free Air 100 ft (30 m)

420W Maximizers and 650W Maximizers are allowed on the same PV string.

Refer to the Lunar System PV Installation and Troubleshooting Guide for detailed rooftop design and diagnostics instructions.

Output voltage from each PV module is individually controlled per each Maximizer to stay within the inverter operating input range. Do not apply string inverter design rules to planning module-level MPPT systems.